Leasehold improvements are the permanent, customized changes a tenant makes to the interior of a rented commercial space — new partition walls, built-in cabinetry, wired-in lighting, permanent flooring, and similar work that stays attached to the building. Federal tax law groups most of these changes under a category called qualified improvement property, and in 2026 a business can deduct 100% of the cost in the year the work is placed in service. Ownership, however, usually runs the other direction: what the tenant builds typically belongs to the landlord once the lease ends.
What Counts as a Leasehold Improvement
Federal tax law defines qualified improvement property as any improvement a taxpayer makes to the interior of a nonresidential building, so long as the improvement is placed in service after the building itself was first placed in service.1Office of the Law Revision Counsel. 26 USC 168 – Accelerated Cost Recovery System – Section: (e)(6) That covers most of what a tenant builds during a commercial fit-out: interior partition walls, drywall, permanent flooring, built-in cabinetry, lighting wired into the building’s electrical, acoustic ceiling grids, and plumbing for break rooms or restrooms.
Three categories are carved out even though they involve interior work: enlarging the building’s footprint, installing or modifying elevators and escalators, and altering the building’s internal structural framework.1Office of the Law Revision Counsel. 26 USC 168 – Accelerated Cost Recovery System – Section: (e)(6) Exterior work such as roof replacements, window upgrades, and façade repairs sits outside the definition because those elements serve the whole building rather than one tenant’s space.
Movable items never count. Desks, computers, freestanding shelving, and trade fixtures a tenant can unbolt and take along are personal property with their own depreciation rules. The dividing line is practical: if removing it would cause real damage to the walls, floors, or ceiling, it is probably an improvement. If it can roll out on moving day, it is not.
Who Owns the Improvements and Who Pays
Nearly every commercial lease provides that permanent improvements become the landlord’s property when the lease ends. This is the default because the improvements are physically attached to the building. A tenant who installs custom lighting, builds out conference rooms, and adds a server closet leaves all of it behind unless the lease says otherwise.
The Tenant Improvement Allowance
Landlords frequently offer a tenant improvement allowance, or TIA, to attract or retain tenants. This is a fixed dollar amount per square foot. In Class A office space, $40 to $80 per square foot is common, though the number varies widely by market and negotiating leverage. If a 2,000-square-foot office costs $120,000 to build out and the allowance covers $80,000, the tenant funds the $40,000 gap. The landlord reimburses the allowance against invoices and lien waivers as work progresses, not as an upfront lump sum.
The terms governing how the allowance is disbursed, what expenses it covers, and the deadlines for completing the work sit in a document called a work letter, attached to the lease. A typical work letter addresses plan approval timelines, change-order procedures, the landlord’s right to review contractor qualifications, and what happens if either side causes a delay. Both parties usually appoint a representative with authority to approve plans and sign off on changes during construction.
Restoration Clauses
The flip side of a generous TIA is the restoration clause. Many leases give the landlord the right to require the departing tenant to strip the space back to its original shell condition at the tenant’s expense. Landlords exercise this most aggressively when the outgoing tenant’s build-out does not match what the next tenant wants, for example a warren of private offices in a market that now prefers open floor plans. Demolition and restoration can run $15 to $30 per square foot, so a 5,000-square-foot office could face a six-figure exit bill. Negotiating this clause during initial lease talks is far cheaper than fighting it at move-out. Tenants who cannot eliminate the clause entirely should push for specific language listing which improvements can remain in place.
Tax Treatment
The tax code offers several ways to recover the cost of leasehold improvements, and picking the right method can free up meaningful cash in the year the work is done.
The 15-Year Recovery Period
Qualified improvement property is 15-year property under the Modified Accelerated Cost Recovery System.2Office of the Law Revision Counsel. 26 USC 168 – Accelerated Cost Recovery System Fifteen years remains the baseline if a business opts out of bonus depreciation or Section 179 expensing. Misclassifying QIP as general building property can trigger a 39-year schedule and forfeit the bonus deduction entirely, so the classification matters.
100% Bonus Depreciation in 2026
The original Tax Cuts and Jobs Act phased down bonus depreciation by 20 percentage points per year starting in 2023, which would have left only a 20% first-year deduction in 2026. The One Big Beautiful Bill Act, signed into law on July 4, 2025, reversed that decline by permanently reinstating 100% bonus depreciation for qualifying business property acquired after January 19, 2025.3Internal Revenue Service. One Big Beautiful Bill Provisions For a tenant who spends $200,000 on a build-out placed in service in 2026, the full cost can be deducted in one year rather than spread over 15.
Bonus depreciation applies automatically unless the taxpayer elects out. It is not capped by a dollar limit and is not reduced by taxable income, though it can create or increase a net operating loss. Businesses expecting higher income in future years may deliberately elect out to preserve deductions for later, but for most tenants the immediate write-off is the better outcome.
Section 179 Expensing
Section 179 offers an alternative first-year deduction for businesses that prefer it over bonus depreciation, or for property that does not qualify for bonus treatment. For 2025, the maximum Section 179 deduction is $2,500,000, and that ceiling phases out dollar-for-dollar once the total cost of qualifying property placed in service exceeds $4,000,000.4Internal Revenue Service. Publication 946 – How To Depreciate Property Those thresholds are adjusted for inflation each year; for 2026, the projected limit is approximately $2,560,000 with a phase-out starting around $4,090,000. Unlike bonus depreciation, the Section 179 deduction cannot exceed the business’s taxable income for the year, so it cannot generate a net operating loss on its own.
Qualified improvement property is explicitly eligible for Section 179 expensing.4Internal Revenue Service. Publication 946 – How To Depreciate Property Some improvements to nonresidential buildings that fall outside the standard QIP definition, including roofs, HVAC systems, fire protection and alarm systems, and security systems, also qualify for Section 179 if placed in service after the building was first put into use.
Is a Tenant Improvement Allowance Taxable to the Tenant?
A landlord’s construction allowance can be excluded from the tenant’s gross income, but only under narrow conditions. Federal tax law limits the exclusion to short-term leases of 15 years or less, and only for retail space, where the allowance is spent on qualified long-term real property that reverts to the landlord at lease end.5Office of the Law Revision Counsel. 26 USC 110 – Qualified Lessee Construction Allowances for Short-Term Leases The exclusion covers only amounts actually spent on the improvements; any excess is taxable. Office tenants, warehouses, and other non-retail commercial users do not qualify for this exclusion and generally treat the allowance as either a rent reduction or income offset by the capitalized improvement cost.
Who Claims the Depreciation
The entity that pays for the improvements claims the tax benefit. When the tenant funds the build-out, the tenant capitalizes the cost as a fixed asset and depreciates it over 15 years, or deducts it immediately through bonus depreciation or Section 179. Leasehold improvements sit on the balance sheet as tangible property, plant, and equipment, not as intangible assets. When the landlord pays, the landlord records the improvement as a fixed asset and claims the depreciation.
What Happens When a Lease Ends Early
Early termination raises a real tax question: what happens to the cost of improvements that have not been fully depreciated? If a tenant walks away from $150,000 of improvements with $90,000 of unamortized basis remaining, that basis does not simply vanish. A tenant who does not retain the improvements at lease termination can recognize a loss equal to their adjusted basis at that time.
The rules differ for landlord-funded improvements. When a landlord makes improvements for a tenant and those improvements are abandoned at the end of the lease, the tax code treats the landlord as having disposed of the property at that point, allowing the landlord to recognize gain or loss.6Office of the Law Revision Counsel. 26 USC 168 – Accelerated Cost Recovery System – Section: (i)(8) If the landlord does not abandon the improvements, because the next tenant can use them, the landlord continues depreciating them on the original schedule.
ADA Compliance in Commercial Build-Outs
Any renovation that qualifies as an “alteration” under the Americans with Disabilities Act triggers federal accessibility requirements, and most leasehold improvement projects clear that bar easily. The ADA defines an alteration as any change that affects the usability of a building, including remodeling, rearranging walls, and reconfiguring floor plans.7ADA.gov. Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities Altered portions of the space must be made accessible to individuals with disabilities, including wheelchair users, to the maximum extent feasible.
The obligation extends further when the renovation touches a primary function area, meaning the main space where the business operates rather than a storage closet or mechanical room. In that case, the path of travel to the altered area, along with restrooms, telephones, and drinking fountains serving it, must also be brought up to accessibility standards.7ADA.gov. Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities Spending on the accessible path of travel does not need to exceed 20% of the total renovation cost. Once that threshold is met, the obligation is satisfied even if the path is not fully compliant.
Both the landlord and the tenant are legally responsible for ADA compliance regardless of what the lease says about who pays. The lease can allocate the cost, but it cannot shift the legal liability. If a visitor files an ADA complaint, both parties are on the hook. Building accessibility into the design phase, through wider doorways, accessible restroom layouts, and appropriate signage, is far less expensive than retrofitting after construction.
Permits, Insurance, and Documentation
Before demolition begins, the tenant needs architectural drawings showing the proposed layout along with mechanical, electrical, and plumbing specifications prepared by licensed professionals. Most leases require the tenant to submit these plans to the landlord for written approval before engaging contractors. The landlord reviews them primarily to confirm the work will not compromise the building’s structure or major systems.
Building permits from the local municipal authority are required for almost all commercial interior work beyond cosmetic changes. The application typically includes finalized blueprints, the landlord’s signed consent, and proof of contractor licensing and insurance. Permit fees vary by jurisdiction and are usually calculated as a percentage of construction cost. Unpermitted work can trigger fines, forced removal, lease violations, and insurance coverage gaps.
At a minimum, require a general contractor to carry commercial general liability insurance, typically $1 million per occurrence, and workers’ compensation coverage. The landlord will almost always require certificates of insurance naming the property owner as an additional insured. Lien waivers from the general contractor and all subcontractors should be collected with each payment draw. They protect the landlord from an unpaid subcontractor filing a lien against the building, and they protect the tenant from paying twice for the same work. Without a certificate of occupancy at the end of construction, the business cannot legally open its doors, so the final inspection and walk-through against the approved plans and work letter are the last steps before the space is truly ready.