How Does a Construction-to-Permanent Loan Work?

A construction-to-permanent loan is a single mortgage that first funds the building of your home in staged payments to the builder, then automatically or manually converts into a long-term mortgage once the house is finished. You apply once, qualify once, and in most cases close once. During construction, you make interest-only payments on the money that has actually been drawn. When the local government issues a certificate of occupancy, the loan rolls into a standard 15- or 30-year mortgage, and you start paying principal and interest like any other homeowner. These loans are built for people putting up a custom home on land they already own or are buying as part of the project.

Single-Close and Two-Close Structures

The first decision is whether to use a single-close loan or a two-close loan. The difference affects your costs, your rate risk, and how much can go wrong between groundbreaking and move-in.

A single-close loan, sometimes called a one-time close, wraps construction financing and the permanent mortgage into one transaction. You lock the permanent interest rate before construction starts, pay closing costs once, and qualify through a single underwriting review. When the home is finished, the loan converts without a second approval. The downside: your permanent rate is set months before you move in, and you cannot shop for a better mortgage once the house is standing.

A two-close loan treats construction and the permanent mortgage as separate deals. You close on a short-term construction loan, then close again on a traditional mortgage after the home is complete. You get the chance to shop for a better rate at the second close, which can help if rates drop during the build. In exchange, you pay closing costs twice and must qualify again, which means a job loss, a credit drop, or added debt during construction can jeopardize the permanent mortgage.

For single-close loans delivered to Fannie Mae, the construction financing converts automatically to the permanent mortgage on completion, and the permanent term cannot exceed 30 years, not counting the construction period.1Fannie Mae. B5-3.1-02, Conversion of Construction-to-Permanent Financing: Single-Closing Transactions

What You Need to Qualify

Lenders apply tougher standards here than on a standard home purchase because the collateral does not fully exist on the day the loan closes. Credit, debt load, and down payment all face stricter thresholds.

Credit and Debt-to-Income

Most lenders require at least a 680 credit score for a conventional construction loan, well above the 620 floor on a standard conventional mortgage. FHA one-time close loans generally start at 620, and VA construction loans also begin around 620 depending on the lender. Your debt-to-income ratio usually needs to stay under about 45 percent for conventional construction financing, and lenders calculate it using the projected full mortgage payment rather than the lower interest-only amount you’ll pay during the build.

Down Payment

Conventional construction loans typically require 5 to 20 percent down on the total project cost, depending on your credit and the lender. FHA options can go as low as 3.5 percent. VA loans may require nothing down for eligible veterans. If you already own the lot, your equity in the land, based on a current appraisal rather than your original purchase price, can count toward the down payment.

Government-Backed Options

FHA, VA, and USDA each offer construction-to-permanent financing with more flexible rules than conventional loans. FHA loans add a mortgage insurance premium to the monthly cost. VA construction loans require a final compliance inspection before the VA will issue its guaranty.2VA News. VA Offers Construction Loans for Veterans to Build Their Dream Homes USDA single-close loans serve low- to moderate-income borrowers building in eligible rural areas, generally communities with populations up to 35,000, with income limits based on household size and location.3Rural Development. Combination Construction-to-Permanent (Single Close) Loan Program Fewer lenders participate in VA and USDA construction programs, so finding one takes some effort.

Documents You’ll Submit

The application package is larger than a standard mortgage because the lender has to evaluate the project as well as you.

Project Documents

You’ll submit professional blueprints (plans and specs), a signed construction contract with a line-item budget covering every anticipated expense, and either a deed or a purchase agreement for the lot. The line-item budget breaks down costs from foundation work through interior finishes and feeds directly into the appraisal.

Builder Vetting

Your general contractor goes through underwriting alongside you. Lenders typically require proof of valid state licensing, general liability insurance (often at least $1 million per occurrence), and workers’ compensation coverage. Some lenders also require an architect’s certification confirming the plans are adequate and that permits and governmental approvals are in order.

Loan Application

The standard form is the Uniform Residential Loan Application, Fannie Mae Form 1003.4Fannie Mae. Uniform Residential Loan Application (Form 1003) You’ll enter the land purchase price and the estimated cost of improvements in the property section, list the full construction contract price as the loan amount (minus funds you’re paying out of pocket), and indicate whether land equity or cash will cover the down payment.

How the Appraisal Values a Home That Doesn’t Exist

Instead of walking a finished house, the appraiser reviews your blueprints, the line-item budget, and comparable recent sales to produce a “subject-to-completion” value, meaning what the property should be worth once the plans are fully executed. Freddie Mac’s guidelines require that when a property has incomplete improvements, the appraisal be completed “subject to” the hypothetical condition that the work is finished, with quality and condition ratings reflecting the completed state.5Freddie Mac. Improvements Analysis (Section 5605.5) That value sets the ceiling on how much the lender will finance. If it comes in low, you’ll need to put more down or scale back the project.

Interest Rate and Payments During Construction

With a single-close loan, your permanent rate is typically locked at the initial closing, before construction begins. That protects you from rate increases over six to twelve months of building, but it also means a drop in market rates leaves you stuck with the higher locked rate. Some lenders offer a float-down option that lets you take a lower rate if the market moves in your favor before conversion. Float-downs usually come with a limited window and sometimes an upfront fee.

During construction, you pay interest only, and only on the money actually drawn. If your builder has used $80,000 of a $400,000 loan, your payment reflects interest on $80,000. Carrying costs stay low while the house is going up.

How the Draws Work

Funds are not handed over in a lump sum. The lender releases money in stages tied to construction milestones, usually around five of them, each roughly 20 percent of the loan:

  • Site preparation and foundation, including clearing, underground plumbing, and the slab or foundation pour.
  • Framing and roofing, including the structural frame, roof, and windows.
  • Rough mechanical work, including electrical, plumbing lines, HVAC ductwork, and insulation.
  • Interior finishes, including cabinets, flooring, countertops, siding, and gutters.
  • Final completion, including trim, paint, appliance installation, final inspections, and the occupancy certificate.

Before each draw, an inspector visits the site to confirm the completed work matches the plans and the percentage of completion justifies the next payment. The lender then authorizes the release, which goes directly to the builder or into a controlled account.

Retainage

Lenders usually hold back part of each draw, typically 5 to 10 percent, until the project is fully complete. Known as retainage, this gives the builder a reason to finish all remaining work and fix defects before collecting the final payment. Retainage sometimes starts at 10 percent in early stages and drops to 5 percent after the halfway mark.

Insurance While Building

Standard homeowners insurance does not cover a structure under construction, so lenders require proof of builder’s risk insurance before releasing funds. A builder’s risk policy covers property damage, theft, vandalism, fire, wind, hail, and damage to materials in transit. It does not typically cover workplace injuries or bodily liability; those sit with the builder’s workers’ compensation and general liability policies, which is why the lender requires proof of those coverages during builder vetting.

Whether you or the builder buys the builder’s risk policy depends on the construction contract. On custom builds, the homeowner often carries it because the homeowner has the larger financial stake. Check your contract, and keep the coverage in force until the permanent mortgage takes over and you switch to a standard homeowners policy.

If Costs or Timelines Slip

Budget Overruns

Construction projects often cost more than planned. A 5 to 10 percent contingency reserve on top of the construction budget is standard, covering material price increases, design changes, and unforeseen site conditions. Your lender will not automatically increase the loan to cover overruns. In most cases those costs come out of your pocket.

For two-closing transactions, Fannie Mae allows documented cost overruns to be included in the permanent loan amount if the overrun costs are paid directly to the builder at closing. A borrower may also finance a second mortgage taken for cost overruns as a limited cash-out refinance, provided the lender documents that the second mortgage proceeds went entirely to construction costs.6Fannie Mae. FAQs: Construction-to-Permanent Financing If you paid for overruns yourself and want reimbursement later, the transaction becomes a cash-out refinance with stricter rules.

Delays

Most construction loans give you 12 months to finish. Running past that deadline means requesting an extension. Extensions are generally available but come with fees, often a few hundred dollars, and the lender may re-evaluate the project before granting one. If your rate lock expires before the extension clears, you can lose the locked rate and convert at the current market rate. Flag schedule problems to your lender early. Lenders tend to work with borrowers who raise issues before they become emergencies.

Converting to the Permanent Mortgage

Conversion happens after the local municipality issues a certificate of occupancy confirming the structure meets building codes and is safe to live in. The lender must retain that certificate, or an equivalent document from the relevant authority, before completing the conversion.7Fannie Mae. B5-3.1-01, Conversion of Construction-to-Permanent Financing: Overview A final inspection by the lender’s representative confirms the finished home matches the blueprints.

On a single-close loan, the construction financing converts to the permanent mortgage automatically once those conditions are met. If the permanent terms changed after the original closing, a separate modification agreement is executed and recorded. The permanent term starts at conversion and cannot exceed 30 years. Your first full principal-and-interest payment is typically due on the first of the month after conversion. Any unused construction funds left in the holdback account are applied to your principal balance, trimming what you owe going forward.

Closing Costs

Closing costs on a construction-to-permanent loan run roughly 2 to 5 percent of the loan amount. They cover lender fees (origination, underwriting, processing), appraisal and inspection costs, title insurance, recording fees, prepaid interest, escrow setup, and draw management fees. Government-backed loans add their own charges: FHA includes an upfront mortgage insurance premium, and VA includes a funding fee. A single-close loan has you pay these once. A two-close structure means paying closing costs on the construction loan and again on the permanent mortgage, which can add thousands to the total.

Deducting Construction Loan Interest

Interest you pay during construction may be deductible, with limits. The IRS allows you to treat a home under construction as a qualified home for up to 24 months, but only if the home becomes your qualified residence once it is ready for occupancy.8Internal Revenue Service. Publication 936, Home Mortgage Interest Deduction The 24-month window can start any time on or after construction begins.

Interest on a loan used to build your home is classified as home acquisition debt. For mortgages taken out after December 15, 2017, you can deduct interest on up to $750,000 of acquisition debt ($375,000 if married filing separately).8Internal Revenue Service. Publication 936, Home Mortgage Interest Deduction You have to itemize on Schedule A to claim it; the standard deduction will not capture this benefit. If your construction loan exceeds the $750,000 cap, only the interest on the portion within the limit is deductible.