A construction loan works by releasing money to your builder in stages as the home gets built, rather than handing you the full amount at closing. You pay interest only on what has been drawn so far, a third-party inspector verifies each phase before the next payment goes out, and when the home is finished the loan either converts automatically into a permanent mortgage or gets paid off by a separate one you take out at that point. Terms typically run 12 to 18 months, rates sit several percentage points above standard mortgage rates, and the whole structure exists because the collateral — the house — does not yet exist when the lender starts funding it.
The Two Basic Structures
Almost every construction loan falls into one of two shapes, and the choice drives how many times you close, how much you pay in fees, and whether you have to re-qualify later.
A construction-to-permanent loan, also called a single-close loan, is one loan with one closing. You lock your permanent mortgage rate up front, pay one set of closing costs, and when construction ends the loan simply shifts into its long-term terms. Fannie Mae limits the construction phase of these loans to no more than 12 months per period and 18 months total.1Fannie Mae. Conversion of Construction-to-Permanent Financing: Single-Closing Transactions
A construction-only loan, or two-close loan, is a short-term loan that funds the build and then gets paid off by a separate mortgage you take out when the home is done. That means two applications, two closings, and two sets of fees. The upside is flexibility: you can shop lenders for the best permanent rate once construction wraps. The downside is that you bear the risk of qualifying — and of whatever rates happen to be in the market — at the end of the project.
Owner-builder loans are a variant of either structure in which you act as your own general contractor. Most lenders restrict these to borrowers who are already licensed builders, because the risk of delays and cost overruns climbs sharply without professional project management.
What You Need to Qualify
Construction loans carry stricter qualification standards than purchase mortgages because the lender is funding something that does not yet exist. The underwriting looks at you, your builder, and the project.
Your Credit, Cash, and Income
You generally need a credit score of at least 680 for a conventional construction loan. FHA construction loans accept scores as low as 580, but a lower score usually brings a higher down payment. Down payments typically start at 20% of total project cost, and many lenders ask for 25% to 30%. Putting down less than 20% generally means paying private mortgage insurance.
Lenders look hard at your debt-to-income ratio. Fannie Mae caps DTI at 36% for manually underwritten loans, allows up to 45% for borrowers who clear additional credit and reserve thresholds, and permits up to 50% on loans run through its automated underwriting system.2Fannie Mae. B3-6-02, Debt-to-Income Ratios For Qualified Mortgage products, the DTI limit is generally 43%.
Your Builder and Your Plans
The lender will require a signed contract with a licensed, insured builder. The builder has to carry commercial general liability coverage — often with limits of at least $1,000,000 per occurrence — plus workers’ compensation and active state licensing. Expect the lender to review the builder’s financial stability, past projects, and business history.
You also have to produce detailed architectural plans and a line-item budget covering every category of hard costs (foundation, framing, roofing, mechanical) and soft costs (architectural fees, engineering, permits, title and filing fees). Most lenders will not fund the project unless the budget includes a contingency reserve of 5% to 10% to absorb surprises like material price increases or hidden site conditions.
Rates, Terms, and Closing Costs
Construction loan rates run several percentage points above conventional mortgage rates because the lender’s risk is higher. The exact rate depends on your credit, the project, and whether the loan is fixed or variable.
Terms typically run 12 to 18 months. During the build, you make interest-only payments calculated on the amount disbursed so far, not the full loan. Early payments are low because only a small share of the money has been released. Payments grow as more draws fund.
Closing costs generally run 2% to 5% of the loan amount and cover origination fees, title insurance, appraisal, and recording charges.3Fannie Mae. Closing Costs Calculator A two-close structure means paying these twice. A single-close structure means paying them once, which on a large project can be meaningful money.
Before closing, the lender orders an as-completed appraisal: a certified appraiser reviews your blueprints and local comparables to estimate what the finished home will be worth, and that value sets the maximum loan-to-value ratio. Federal rules require a Loan Estimate within three business days of application and a Closing Disclosure at least three business days before you sign.4eCFR. 12 CFR 1026.19 – Certain Mortgage and Variable-Rate Transactions5Consumer Financial Protection Bureau. TILA-RESPA Integrated Disclosure FAQs
How Draws and Inspections Work
After closing, construction begins and the loan funds through a draw schedule tied to major milestones: foundation, framing, roofing, mechanical rough-in, and so on. Each time a phase is complete, the builder submits a draw request specifying the dollar amount needed for the next round of subcontractors and materials.
Before any money moves, a third-party inspector visits the site to confirm the work in the draw request is actually finished and matches the plans and budget. Inspection fees are usually a few hundred dollars per visit and are often deducted from the loan proceeds. This verification protects you and the lender from paying for work that is incomplete or substandard.
Lenders also hold back a share of each draw, called retainage, until the project hits a defined milestone or final completion. Retainage usually runs 5% to 10% of each payment. A lender might, for instance, hold 10% of each draw until the project reaches 50% completion and then reduce the holdback to 5% for the remaining draws. The retainage gives the builder a financial reason to finish the job and keeps money available to resolve any punch-list items at the end.
Protecting Yourself During the Build
Lien Waivers
A real financial risk during construction is that a subcontractor or supplier goes unpaid even after you have released funds to the general contractor. In most states, unpaid subcontractors and suppliers can file a mechanics lien against your property, giving them a legal claim on the home regardless of whether you already paid the contractor for that work. You could end up paying twice, or facing a lien that clouds your title.
Lien waivers are the main defense. At or before each draw, you or your lender should collect signed waivers from the general contractor and every subcontractor and supplier who worked on that phase. A lien waiver is a written acknowledgment that the signer has been paid and gives up the right to file a lien for the covered work. Many lenders require waivers as a condition of releasing each draw. If yours does not, ask for them anyway. Form and timing rules vary by state.
Change Orders
Changes to the original plan — different materials, an extra room, upgraded finishes — go through formal change orders that amend the construction contract. Each change order should spell out the new scope, the cost difference, and any effect on the timeline. Your lender needs to approve any change order that affects the total budget, because the approved loan amount was based on the original estimate.
If change orders push project cost above what your loan covers, you generally pay the difference out of pocket. In a two-close arrangement, documented cost overruns may be rolled into the permanent mortgage if the overrun costs are paid directly to the builder at closing.6Fannie Mae. FAQs: Construction-to-Permanent Financing You typically cannot reimburse yourself for overruns you have already paid from personal funds; doing so may trigger cash-out refinance requirements instead of a standard conversion.
When the Build Runs Long
Weather, supply-chain disruptions, permit delays, and subcontractor scheduling problems can all push a project past its original timeline. If construction is not finished by the loan’s maturity date, you need a plan, because the full remaining balance comes due at that point.
Most lenders allow at least one extension, commonly for three months, with fees often around 0.50% of the loan amount. Some lender guidelines limit borrowers to a single three-month extension and nothing beyond that. You generally have to request the extension before the original maturity date; waiting until after expiration can trigger a default.
If an extension is denied or already used, consequences escalate quickly. The loan may shift to a default interest rate, which is significantly higher than the original. In the worst case, the lender can declare the full balance immediately due. At that point your options narrow to refinancing with another lender, securing a bridge loan, or selling the unfinished property. A realistic timeline buffer and a healthy contingency reserve are the practical defenses.
Moving to a Permanent Mortgage
The transition to a permanent mortgage begins when your local building department issues a Certificate of Occupancy, confirming the home meets safety codes and is ready to live in. The lender conducts a final inspection and releases any remaining retainage to the builder.
What happens next depends on your structure. With a single-close loan, the debt automatically shifts into the permanent terms you locked at closing, usually a 15- or 30-year fixed or adjustable rate. Interest-only payments give way to a standard principal-and-interest schedule, and there is no second closing.1Fannie Mae. Conversion of Construction-to-Permanent Financing: Single-Closing Transactions
With a two-close loan, you apply for and close on a separate permanent mortgage to pay off the construction balance. That means a second round of closing costs, a new credit check, and re-qualification at whatever rates are available when construction ends. If rates have risen since you started, your permanent payment can be higher than you projected. The tradeoff is the freedom to shop multiple lenders at that point instead of being locked into terms set months earlier.
A Note on Deducting the Interest
Interest paid on a construction loan can be tax-deductible, but only if the home qualifies under IRS rules. You can treat a home under construction as a qualified home for up to 24 months, and only if it becomes your main home or second home once it is ready to live in.7Internal Revenue Service. Publication 936, Home Mortgage Interest Deduction If the home never becomes a qualified residence — if you sell it before moving in, for instance — the interest is generally not deductible as home mortgage interest.
For loans secured after December 15, 2017, the mortgage interest deduction applies to acquisition debt up to $750,000, or $375,000 if married filing separately, and your construction loan balance counts toward that limit.7Internal Revenue Service. Publication 936, Home Mortgage Interest Deduction Tax legislation enacted in mid-2025 may affect these thresholds, so check IRS.gov for current figures when you file. Keep detailed records of every interest payment during construction; your lender’s year-end tax form may not break the interest out in a way that matches what you need for the deduction.