Yes, you can get a single loan to buy land and build a house on it. The most common product is a construction-to-permanent loan, which finances the lot purchase and the building costs together and then converts into a standard mortgage once the home is finished. Conventional versions usually require about 20% down, but FHA, VA, and USDA programs can bring that down to 3.5% or even zero for borrowers who qualify. The trade-off is tighter credit standards, more paperwork, and a lender who scrutinizes your builder almost as closely as they scrutinize you.
One Loan or Two?
Construction financing comes in two basic shapes, and the choice affects your closing costs, your rate risk, and how much flexibility you have if plans shift.
Single-Close (Construction-to-Permanent)
A single-close loan wraps the land purchase, the building costs, and the long-term mortgage into one agreement with one set of closing costs. You close before construction starts, and the lender releases funds in stages as the builder completes work. During the build you make interest-only payments on the amount drawn so far. Once the home is finished and the local building department issues a certificate of occupancy, the loan automatically converts into a permanent mortgage with a term of up to 30 years.1Fannie Mae. B5-3.1-02, Conversion of Construction-to-Permanent Financing: Single-Closing Transactions The main appeal is locking the long-term interest rate up front, so six months of rising rates won’t change your monthly payment once you move in.
Two-Close (Standalone Construction Loan)
A standalone construction loan finances only the building phase, usually for about 12 months with interest-only payments. When the house is complete, you close on a separate mortgage to pay off the construction debt. That means two applications, two underwriting reviews, and two sets of closing costs. It’s more expensive on the front end, but it gives you room to shop for a better permanent rate if your financial picture improves during the build, and the second loan can be sized to the final project value rather than the original estimate. Some borrowers end up here because their construction lender doesn’t offer a competitive long-term product.
Low and No Down Payment Options
If 20% down is the obstacle, government-insured construction loans open doors conventional products don’t.
FHA One-Time Close
FHA-insured construction loans allow a down payment as low as 3.5% of the total project cost, land included. Credit requirements are lower too: FHA’s floor is 580 for maximum financing, though most lenders set their own minimum in the mid-600s. You’ll pay FHA mortgage insurance for the life of the loan unless you refinance out later, and the total can’t exceed FHA limits for your county. In 2026, those limits range from $541,287 in standard-cost areas up to $1,249,125 in the most expensive markets.2U.S. Department of Housing and Urban Development. HUD Federal Housing Administration Announces 2026 Loan Limits
VA Construction Loans
Veterans and eligible service members can use a VA-backed purchase loan to build a new home with no down payment at all, as long as the total cost doesn’t exceed the appraised value of the finished property.3Veterans Affairs. Purchase Loan You’ll need a Certificate of Eligibility, and the home must be your primary residence. Finding a lender that actually handles VA construction loans takes more legwork than a standard VA purchase, because not every VA-approved lender runs the construction draw process.
USDA Construction Loans
The USDA’s Single Family Housing Guaranteed Loan Program offers 100% financing for homes built in eligible rural areas, with no down payment required.4USDA Rural Development. Single Family Housing Guaranteed Loan Program Income limits apply and vary by county and household size. The property has to meet USDA site requirements, including adequate water and wastewater systems that comply with federal standards.5USDA Rural Development. HB-1-3550 Chapter 5 Property Requirements
What It Takes to Qualify
Construction loans carry stricter standards than regular mortgages because the collateral, a finished home, doesn’t exist yet.
Credit Score
A 680 credit score is the starting point for most conventional construction loans, with some lenders pushing to 700 or higher for the best rates. Government-backed programs are more forgiving. FHA construction loans can work with scores in the low 600s, and VA loans have no official minimum, though individual lenders typically want at least 620. If your score sits below 680, shopping multiple lenders matters more than usual because requirements vary a lot.
Debt-to-Income Ratio
Your total monthly debt payments divided by gross monthly income generally needs to stay below 43%, which aligns with the qualified mortgage standard most lenders follow. Construction loans are especially sensitive to this ratio because cost overruns during the build can strain cash flow beyond what the original budget projected.
Down Payment and Reserves
Conventional construction loans typically require at least 20% of the total project value, including the land. Loans for raw land or projects with thin builder credentials may push that toward 25% to 30%. Government-backed alternatives drop the bar sharply: 3.5% for FHA, zero for qualifying VA and USDA borrowers. On top of the down payment, most lenders want liquid savings covering several months of total housing payments, with six months being a common benchmark for construction financing. The reserves exist because the build may take longer and cost more than planned.
Interest Rates
Construction loan rates run roughly one percentage point above standard 30-year mortgage rates because the lender takes on more risk during the build. As of early 2026, construction-to-permanent rates generally fall between 6.75% and 8.50%, while standalone construction loans tend to run slightly higher. Owner-builders, where the borrower acts as general contractor, face the steepest rates, and most lenders will only approve that arrangement if the borrower holds a valid contractor’s license.
How the Land Itself Affects Approval
Not all vacant land looks the same to a lender, and the condition of the lot shapes the rate, the down payment, and sometimes whether you get approved at all. Lenders sort land into three tiers based on existing infrastructure.
- Raw land: No roads, electricity, water, or sewer connections. Lenders treat this as the riskiest category because the cost to make it buildable is unpredictable. Expect down payments of 20% or more, higher rates, and a detailed plan showing how you’ll bring in utilities before construction begins.
- Unimproved land: Some infrastructure exists but may be outdated or non-functional. An old well or a gravel road gets the lot closer to buildable, but lenders still want to see budgets for upgrades. Down payments and rates land between raw and improved.
- Improved land: Roads, utilities, and communication lines are already in place. Banks treat this much like a conventional transaction, approval is smoother, and rates are lower.
If you’re looking at raw acreage far from utility lines, build the cost of bringing in power, water, and sewer (or installing a well and septic system) into your total project budget. Some lenders won’t approve a construction loan until utility access is confirmed, because a house without water or electricity has limited resale value as collateral.
If You Already Own the Lot
If you already hold title to the land, its appraised value can typically count toward your down payment or equity requirement. For a conventional loan needing 20% down, owning a lot worth 25% of the total project cost may mean no additional cash at closing. FHA, VA, and USDA programs also allow land equity to satisfy their down payment thresholds. If you still owe money on the lot, your equity is the appraised value minus the outstanding balance, and most lenders will roll the remaining land debt into the construction loan. The land must be titled in your name before closing (some lenders allow the transfer at closing for inherited or gifted property), and you’ll need a clear title search showing no construction liens or other encumbrances.
What the Lender Will Want to See
Construction loan applications are paper-heavy because the lender is underwriting you and the project.
The Construction Package
You’ll need architectural blueprints, floor plans, and a detailed specification sheet listing every material and finish. The lender uses these to order an “as-completed” appraisal estimating what the finished home will be worth. Without firm plans, the lender can’t calculate a loan-to-value ratio, so vague ideas won’t move the file forward. Most lenders also want a cost breakdown separating hard costs (labor and materials for the physical structure) from soft costs (architectural fees, permits, engineering, insurance). Many construction loans finance both, but some cap the soft-cost percentage.
Builder Qualifications
Your builder’s credentials get almost as much scrutiny as your finances. Lenders typically require a valid contractor’s license, proof of general liability insurance, workers’ compensation coverage, and references from completed projects. A signed construction contract laying out the total cost, payment schedule, and projected completion timeline is mandatory, and that contract becomes the backbone of the draw schedule the lender uses to release funds.
Personal Financial Documents
Expect to provide two years of W-2 forms and federal tax returns to demonstrate income stability, plus bank statements from the most recent 60 days showing down payment funds and reserve balances. Self-employed borrowers usually need two years of business tax returns and a current profit-and-loss statement. All of this feeds into the Uniform Residential Loan Application (Form 1003), which every conforming lender uses.6Fannie Mae. Uniform Residential Loan Application Form 1003 The property section needs the legal description of the land from the deed.
How the Money Reaches the Builder
Unlike a regular mortgage where you receive the full loan amount at closing, construction loan funds are released in stages called draws. Each draw corresponds to a completed phase of building (foundation, framing, roofing, mechanical systems, interior finishing), and the builder submits a draw request when a phase wraps up.
Before the lender releases any money, a third-party inspector visits the site to verify the work matches the approved blueprints and specifications. If the inspector finds incomplete work or materials that don’t match the spec sheet, the draw is held until corrections are made. This protects you from paying for work that hasn’t actually been done.
Lien waivers are the other critical piece. Each time a subcontractor gets paid, they sign a document waiving their right to place a lien on your property for that payment. The general contractor collects these from every sub. A conditional waiver accompanies the current draw request; an unconditional waiver confirms receipt of payment from the previous draw. Skipping this step is how homeowners end up with mechanics’ liens filed by subcontractors who say they were never paid, even when the general contractor received the money. Your lender should require these at every draw, but confirm it.
Costs That Sit Outside the Construction Contract
The builder’s contract covers the house itself. Several significant costs fall outside that number, and missing them is one of the fastest ways to burn through your contingency before the drywall goes up.
Residential building permits typically run between $1,000 and $3,000, often calculated as a per-thousand-dollar charge based on the project’s valuation, and that usually doesn’t include separate trade permits for electrical, plumbing, and mechanical work. Impact fees charged by local governments for schools, roads, parks, and utility infrastructure vary wildly: some jurisdictions charge nothing, others assess fees reaching tens of thousands of dollars. Call the local building department early to get a firm number.
A boundary survey, typically required before construction begins, runs from around $500 for a small suburban lot to several thousand dollars for larger or irregularly shaped parcels. Title insurance costs roughly $1,300 to $4,700 on a median-priced home purchase. Single-close loans require one title policy; two-close loans require two.
Most lenders require a builder’s risk policy before construction begins, covering the partially built structure against fire, theft, vandalism, and weather damage. Standard homeowner’s insurance doesn’t cover a house under construction. Premiums typically run 1% to 5% of the construction budget, so on a $350,000 build, budget $3,500 to $17,500 for coverage during the build.
Experienced builders and lenders both recommend setting aside 10% to 15% of total construction costs as a contingency fund for surprises, and surprises are almost guaranteed: rock that wasn’t visible during the soil test, material price spikes, weather delays that push subcontractor schedules out by weeks. A budget with zero margin is a bet that nothing will go wrong during a process where something almost always does.
What Happens If You Go Over Budget
This is where many first-time builders get caught off guard. If construction costs exceed the approved loan amount, you cover the difference, not the lender. The lender funded the project based on a specific budget and appraisal, and they generally won’t increase the loan mid-build without a formal modification, which isn’t guaranteed and may require a new appraisal.
Your options at that point are limited: tap the contingency reserve, use personal savings, negotiate with the builder to value-engineer the remaining work by substituting cheaper materials or simplifying finishes, or take out a personal loan or line of credit to bridge the gap. Two-close loans offer slightly more flexibility because the permanent mortgage is sized after the project is complete, but the construction phase shortfall still needs to be covered in real time. The best defense is an honest budget with a real contingency cushion built in before you break ground.